NCACCH – Stage Two

RAW Commercial Projects completed Stage Two of NCACCH's Maroochydore premises — a 546 sqm office fitout designed to support the growing team and community programs of Manngoor Dja, extending the cultural design language of Stage One into a purpose-built staff and community hub.

NCACCH (Manngoor Dja)

546 sqm

13 weeks (across two stages)

Maroochydore, Sunshine Coast

The Brief

Following the successful delivery of Stage One, RAW Commercial Projects completed Stage Two of NCACCH’s new premises in Maroochydore — a 546 sqm office fitout designed to support NCACCH’s growing team and community engagement programs. The client requested a warm, professional environment promoting staff wellbeing and collaboration. Key features included a community kitchen and training room with a gas strut window for flexibility, and a dual-entry system allowing separate access for the community and staff. The open-plan workspace at the rear was positioned for optimal natural light and privacy, incorporating meeting rooms, private offices, and amenities.

The Outcome

NCACCH’s Maroochydore premises now operate as a fully integrated community health and office environment — with Stage One’s medical suite and Stage Two’s office fitout together forming a cohesive, culturally rich, and functionally excellent facility. One of RAW’s most meaningful and complex deliveries, and one the entire team is deeply proud of.

The Design

Stage Two continued the close collaboration with NCACCH to bring their branding and cultural identity into the built environment. Vibrant graphics across glazing and walls bring brightness, warmth, and a sense of ownership to the space. Feature carpet and carefully selected finishes add a corporate polish while aligning with the community-led feel of Stage One. The open-plan design supports team productivity and collaboration, while community-facing areas offer flexibility for training sessions, events, and meetings.

Construction

The 546 sqm fitout was delivered within the same overall 13-week program as Stage One, with RAW managing all trades across partitioning, joinery, glazing, flooring, electrical, data, mechanical, kitchen installation, graphics, and furniture. The gas strut window connecting the kitchen and training room required specialist detailing and careful sequencing.